Link-systems LinkNet II Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Měřící nástroje Link-systems LinkNet II. LINK Systems LinkNet II User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 99
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
LinkNet 2 LinkNet 2
Pressroom Pressroom
Monitoring Monitoring
LinkNet 2 inkNet 2
Software Software
Installation and Operating
Manual
Installation and Operating
Manual
R
Link Electric & Safety Control Co.
444 McNally Drive
Nashville, TN 37211
Phone: (615) 833-4168
Fax: (615) 834-1984
© 2001
Zobrazit stránku 0
1 2 3 4 5 6 ... 98 99

Shrnutí obsahu

Strany 1 - LinkNet 2 inkNet 2

LinkNet 2 LinkNet 2 Pressroom Pressroom Monitoring Monitoring LinkNet 2 inkNet 2 Software Software Installation and Operating ManualInstallation and

Strany 2

• Reports are generated using Seagate Software Crystal Reports. This allows the end user to customize (with separate purchase of Crystal Reports fro

Strany 3 - Table of Contents

Section 2 Installation LinkNet is connected to each piece of equipment in a bussed arrangement commonly called “daisy chaining”. The means that t

Strany 4

Belden 8103 cable and many similar cables organized as twisted pairs use a special color code scheme. Instead of each wire using a different color,

Strany 5

Figure 2.2: Regular Drop Box Network Connections Figure 2.3: Repeater Drop Box Network Connections All three connectors should be wired as follow

Strany 6 - Table of Figures

2.3 OmniLink LCD Operator Terminal Network Connections There should be five connectors on the back of the OmniLink 5000 operator interface terminal

Strany 7

2.4 OmniLink II LCD Operator Terminal Network Connections Figure 2.5: OmniLink II LCD Operator Terminal (Front View) There are eight connectors an

Strany 8

2.5 MicroLink Operator Terminal Network Connections The communications ports for the MicroLink operator terminal are internal to the unit. The back

Strany 9 - Section 1 Introduction

2.6 System 1100 Connections System 1100 tonnage monitors with software versions older than version 3.2 in the operator interface board (the circuit

Strany 10

2.7 Software Installation Once the wiring is completed, the software on the host computer must be installed. Insert the LinkNet compact disk (CD)

Strany 11 - Section 2 Installation

Section 3 Terminology In order to fully understand and get the best use of this manual, it is strongly suggested that this section be read! Through

Strany 13

• Scrap - The portion of material that ideally would have been a good part, but due to some defect is not usable. For instance, if a punch in the

Strany 14 - View) Network Connections

• Run - A run is the production of a certain number of parts from a job. While LinkNet collects data by date, shift, etc., it also collects statis

Strany 15 - Network Port

• Break Time - Time during a shift when operators are on break. Data is collected but under a break time code. See section 4.7 for details on sch

Strany 16

Section 4 Configuration After the software is installed, it must be configured. This consists of the following steps: • Configure LinkNet securit

Strany 17

4.2 Operator Configuration Before anything else can be done in LinkNet, operators must be configured. Any number of operators can be configured, ea

Strany 18

4.2.1.2 Operator Computer Permissions The “Comp. Perm.” (Computer Permissions) tab is used to configure the operations each LinkNet user is allowed

Strany 19 - Section 3 Terminology

4.2.1.4 Operator Notes Figure 4.6: Operator Configuration Notes Dialog Box The “Notes” tab allows notes to be entered for the operator. These no

Strany 20

4.3 Database Location Configuration (Standalone and Server Versions Only) By default, LinkNet stores its database files in the directory where it is

Strany 21

4.5 Communications Port Configuration LinkNet uses a standard RS-232 serial port (commonly called a “comm port”) to communicate with the machines o

Strany 22

4.6 Configuring Shifts LinkNet collects most information only while in a shift. This keeps the system from needlessly filling up the hard drive wi

Strany 23 - Section 4 Configuration

Table of Contents Section 1 Introduction...

Strany 24

4.7 Configuring the Shift Schedule To configure the shift schedule, select “Configure” and then “Schedule” from the LinkNet menu. A dialog box simil

Strany 25

Daily Schedule Extension: A shift could possibly run for two non-contiguous times during the day. When adding another scheduled time for a shift (be

Strany 26

4.7.1 Adding a Shift Schedule Time To add a scheduled time, press the “Add Time” button at the bottom of the pressroom schedule listing dialog box.

Strany 27 - Configuration Dialog

4.7.3 Adding a One-Time Schedule Entry To add a one-time schedule adjustment, select the “one-time adjustments” button (see Figure 4.12). Any curre

Strany 28

4.8 Down Time Configuration Down time codes (DTCs) are numeric values that have a user assigned meaning attached to them. These codes allow the us

Strany 29

4.8.1.1 Adding a Down Time Category To add a down time category, hit the “Add Category” button on the down time category listing (see Figure 4.15) a

Strany 30

4.8.2 Down Time Code Configuration To configure down time codes, select “Configure” and then “Down Time Codes” from the LinkNet menu. A dialog box

Strany 31

Meaning: The meaning of the down time code and its intended use can be entered here. 4.8.2.2 Editing a Down Time Code To Edit a DTC, select a D

Strany 32

4.9 Machine Configuration Since the same network cable is shared by each machine on the network (see Figure 2.1), LinkNet uses a machine number to

Strany 33

4.9.1.1 Machine General Settings The “General” machine settings page (see Figure 4.20) contains information and settings required for the proper ope

Strany 34

4.12.2 Editing Parts... 4.29 4.12.3 De

Strany 35

Stroke: The stroke of the press. Con. Rod Length: The length of the connecting rod that goes from the crankshaft to the slide. Min. Shutheight:

Strany 36

4.9.1.4 Machine Miscellaneous Settings The “Miscellaneous” settings page (see Figure 4.23) contains the press idle timeout value and several other s

Strany 37

4.9.2 Editing a Machine From the machine listing (see Figure 4.19), select a machine and hit the “Edit Machine” button. Alternatively, the machin

Strany 38 - Figure 4.19: Machine Listing

4.10 Material Configuration Material, if desired, can be associated with jobs that run on machines. Figure 3.2 shows the relationship between a mach

Strany 39

4.10.1.1 Material General Settings The “General” material settings page (see Figure 4.25) contains internal and supplier part numbers and descriptio

Strany 40

Weight Per Length: The weight per length (in the units specified to the right of the entry field) of the material. Avg. Coil Weight or Weight Per Pi

Strany 41

4.11 Tooling Configuration For LinkNet to track tool strokes and other tooling related preventive maintenance, tooling must be configured and associa

Strany 42

4.11.1.1 Tool General Settings The “General” tool settings page (see Figure 4.28) has the following settings: Tool Number: The tool number can be

Strany 43

Maximum SPM: The maximum SPM at which this tool should be run regardless of the capability of the machine in which it is run. Bed Width: The width

Strany 44

4.12 Part Configuration LinkNet can track many statistics by part number as well as tool and job. To do this, some part information must be configur

Strany 45

Section 8 Using the OmniLink 5000 with LinkNet (Color OIT)... 8.1 8.1 Configuring the OmniLink

Strany 46 - Figure 4.27: Tool Listing

4.12.1.1 Part General Settings The “General” part settings page (see Figure 4.31) has the following settings: Internal Part Number: The internal p

Strany 47

4.12.2 Editing Parts From the part listing (see Figure 4.30), select a part and hit the “Edit Part” button. Alternatively, the part can be “double

Strany 48

4.13 Job Configuration Jobs are the central unifying element in LinkNet data collection. In LinkNet, as shown in Figure 3.2, jobs bring together mac

Strany 49 - Figure 4.30: Part Listing

4.13.1 Adding a Job Adding a job is a little different from adding most of the other items in LinkNet, such as parts or material, in that the machin

Strany 50

4.13.1.1 Job General Settings The “General” job settings page (see Figure 4.35) has the following settings: Job Number: The job number for this jo

Strany 51

4.13.1.2 Job Physical Characteristics Settings The “Physical Characteristics” settings page (see Figure 4.36) contains information about the physica

Strany 52 - Figure 4.33: Job Listing

4.13.1.3 Job Tooling Settings The “Tooling” settings page (see Figure 4.37) specifies the tooling to be used with the job. As can be seen in the fi

Strany 53

4.13.2 Editing Jobs From the job listing (see Figure 4.33), select a job and hit the “Edit Job” button. Alternatively, the job can be “double clic

Strany 54

4.14 Tonnage Wave Capture Configuration LinkNet has tonnage signature capture built in. In fact, the system can be set up so that tonnage monitor

Strany 55

4.15 Preventive Maintenance Configuration Preventive maintenance (PM) allows one or more setpoints to be entered for each machine or tool. These s

Strany 56

Table of Figures Figure 2.1: LinkNet Wiring Overview ...

Strany 57

4.15.1 Adding a Preventive Maintenance Item To add a PM item, hit the “Add PM Item” button and the dialog from the PM listing dialog of a machine

Strany 58

PM Item Type: Select the type of limit this PM item should have. This can be one of the following: Running Time: Amount of time the press was actu

Strany 59

4.15.4 Resetting a Preventive Maintenance Item When a PM has “tripped” (exceeded its limit), it will appear in the “tripped items” PM report. Wh

Strany 60

Section 5 Using LinkNet 5.1 The Overview Window When LinkNet is started, there is one screen open by default, the pressroom overview window (see

Strany 61

SPM: The current strokes per minute of the press updated every 15 seconds. Note that in single stroke operations with a long time between strokes th

Strany 62

5.2.2 Tonnage Detail The tonnage detail screen (“Peak Tons” tab - see Figure 5.3) shows the tonnage, high setpoint, low setpoint, reverse setpoint,

Strany 63 - Section 5 Using LinkNet

5.2.3 Average Tonnage Graph Detail The average tonnage detail screen (“Average Tons Graph” tab - see Figure 5.4) graphically shows the average tonn

Strany 64

5.2.4 Stroking Rate Graph Detail The stroking rate detail screen (“Stroking Rate Graph” tab – see Figure 5.5) graphically shows the production rate

Strany 65

5.2.5 SPM Rates Detail The SPM rates detail screen (“SPM Rates” tab – see Figure 5.6) shows the hours, maximum SPM, average SPM, standard SPM, and c

Strany 66

Section 6 Reports There are several reports that can be generated from the data that LinkNet collects. In addition, these reports can be modified

Strany 67

Figure 4.38: Tonnage Waveform Configuration Dialog Box ... 4.36 Figure 4.39: Machine Config

Strany 68

explanation of the time types. Each report has a default selection for the time types that typically works best for that report. To select a custom t

Strany 69 - Section 6 Reports

6.1.3 Report Machine Selection Many reports allow the selection of the machine or machines for which they are to be run. For instance, a report cou

Strany 70

6.1.4 Report Tool Selection Many reports allow the selection of the tool or tool for which they are to be run. For instance, a report could be run

Strany 71

6.1.5 Report Part Selection Many reports allow the selection of the part or parts for which they are to be run. For instance, a report could be run

Strany 72

The event log records the machine number, shift date, shift, start time, end time (for down time codes), duration, Run/Program switch status, tonnag

Strany 73

For each machine, the report shows (for each job run on the machine) the job description, tooling used, part number made, number of runs, number of st

Strany 74

6.9 Tool Reports – Tool Down Summary The tool down summary report provides information on how many times, with what severity, and at what approximate

Strany 75

6.13 Part Reports - Trend Part trend reports show the history of certain statistics over time. For each run of a part, the OEE, uptime percentage,

Strany 77

Section 7 Using the OmniLink 5000 with LinkNet (Monochrome OIT) The OmniLink 5000 press automation control gains some powerful new capabilities

Strany 79

Figure 7.3: OmniLink (Monochrome) Communications Configuration Screen • Push the “CONFIG COMM.” softkey to display the communications setup screen,

Strany 80 - Configuration Screen

7.2 Using Down Time Codes on the OmniLink 5000 (Monochrome OIT) Down time codes (DTCs) are a way for the press operator to easily keep a record of

Strany 81

7.3 Network Job Storage on the OmniLink 5000 (Monochrome OIT) Virtually unlimited job storage is available when using an OmniLink 5000 with

Strany 82

7.5 Sending Tonnage Graphs from the OmniLink 5000 (Monochrome OIT) LinkNet has the ability to receive and display tonnage signatures from t

Strany 83

NOTES” softkey to display the notes entered for the currently selected job (see section 4.13.1.5 for details on how to enter job notes). The same pag

Strany 84

Section 8 Using the OmniLink 5000 with LinkNet (Color OIT) The OmniLink 5000 press automation control gains some powerful new capabilities when

Strany 85

StrokeModeDriveSpeedStrokeSpeedSPMSPM2000OrderCounterPC STATUSCounter OFFTOP DISP.CONFIG.CHANGESETTING00Program/Run SwitchEXITZEROSTROKECOUNTACCESSCON

Strany 86 - Terminal)

8.2 Using Down Time Codes on the OmniLink 5000 (Color OIT) Down time codes (DTCs) are a way for the press operator to easily keep a record of reaso

Strany 87

If a down time code is active, whether automatic or operator entered, a “CLEAR DOWN TIME CODE” softkey will be displayed. Hitting this softkey will

Strany 88

screen will display the status of the job download. A message will appear at the end of the download indicating success or failure or the job recall.

Strany 89

Section 1 Introduction The Link Systems Network Application (LinkNet 2) provides detailed monitoring of stamping operations utilizing Link equipme

Strany 90

8.6 Viewing Machine and Job Notes on the OmniLink 5000 (Color OIT) OmniLink 5000 operator interface terminals can display notes entered at the Link

Strany 91

Section 9 Using the MicroLink OIT with LinkNet The MicroLink OIT gains some powerful new capabilities when combined with LinkNet. The MicroLi

Strany 92

are sent by the MicroLink under certain conditions without operator intervention. In all cases, automatically entered down time codes are automatical

Strany 93

• If the network is off line, a message indicating this will appear. Jobs may NOT be recalled from the network if it is off line! Otherwise, a prom

Strany 95

Section 10 Using the System 1100 Tonnage Monitor with LinkNet The System 1100 tonnage monitor gains down time codes, tonnage logging, and virtuall

Strany 96

Note that the current DTC can be shown as “SP”. This signifies that an automatic DTC is in effect. These automatic down time codes, such as “Press

Strany 97

To store a job: • From the top level menu (the top level menu can be reached by hitting the “EXIT” key until the menu does not change), use the up a

Strany 98

10.5 Sending a Tonnage Graph from the System 1100 The System 1100 can send a tonnage graph to LinkNet for archival or analysis purposes. To send

Strany 99

Manual Version 1.1 10/28/2001 10.5

Komentáře k této Příručce

Žádné komentáře